Wire the complete OCR review and indexing production pipeline:
durable OCR result handoff before remote deletion (17a), native-page
evidence and quality-gated candidate composition (17b), review images
and restart-safe candidate loading (17c), transactional approval and
rejection decisions (17d), reviewed-artifact indexing store with exact
count verification (17e), and production approve-to-ready wiring with
fail-closed OCR_INDEXING_UNAVAILABLE (17f). Activation remains a
separately authorized operation; task 7.4 stays pending.
Document the .git migration from Desarrollo/IA/ to RAG/ and the
restructuring commit b9a37f2 that promoted RAG/ content to repo root.
Includes instructions for the next RAG agent to verify EasyPanel
deployment after the path changes (Dockerfile now at repo root).
- RAG/ subfolder content promoted to repo root (git detected as renames)
- Remove parent-level docs/ and .gitignore from tracking (not part of RAG project)
- Add .atl/ to .gitignore (local agent caches)
- No history rewrite; prior commits preserved as-is